Requirement
State which bottles must move between which stations, in what condition and orientation, and how accepted placement/handover is confirmed. Name interface, setup and recovery owners.

Prepare a bottle-handling brief with formats, empty and filled weights, surface and closure conditions, orientations, conveyor states and transfer criteria.
Supply bottle drawings or samples for every intended format, with empty and filled weights, actual surface conditions, closures and proposed grip areas. Map pickup and placement orientations, conveyor supply and downstream demand, then define accepted transfer, changeover and missing/unstable-bottle recovery.
Use the complete transfer sequence and run-off plan to turn the brief into testable requirements. Separate confirmed interfaces from proposed equipment or settings that still need review.
Plan robotic bottle handling around your parts, process, cycle time, tooling, recovery and acceptance criteria. Discuss the highest-risk feasibility questions with Oxford Industrial Automation. A clear brief should state the operating range for part, product and process variation for robotic bottle loading & transfer and your requirements for run-off criteria and production evidence.
Discuss your application

State which bottles must move between which stations, in what condition and orientation, and how accepted placement/handover is confirmed. Name interface, setup and recovery owners.
Define actual formats, empty/filled weights, surfaces, closures and presentation variation, including conveyor supply and downstream demand. Mark assumptions and untested conditions clearly.
Agree representative grip, transfer, placement and bottle-condition checks with repetitions and full-cycle observations. Include waits, format changes and controlled missing/unstable-bottle recovery.
For robotic bottle handling, use “shall” only for a requirement that can be demonstrated. Keep preferences, assumptions, provisional line connections and future options clearly separate.
Your final robotic bottle handling scope must also account for operator access, recovery and changeover, run-off criteria and production evidence, current regulations and the conditions at your site.